Slope Stability

Slopes and cliffs can fail due to a number of reasons from simply natural erosion at the toe or a rise in groundwater level or the activities of man. BWB has in-house consultants that have an in depth knowledge of the mechanisms that lead to failures and the latest software to model the failure and generate cost effective and sustainable solutions. All the designs are to current British Standards and Eurocode EC7.

Related Projects

Student Accommodation, Portswood Road

BWB are proud to be involved in this purpose-built state-of-the art student accommodation in Southampton.

The development will create a metropolitan and homely environment for the stude...

Key contacts: Colin Langford

ENABLING WORKS, G. PARK, CRICK

BWB Consulting was commissioned by Buckingham Group to deliver civil engineering and infrastructure design services to enable the construction of a Costco distribution warehouse at Crick in Northampto...

Key contacts: Bouziane Boukhateb

Sports City, Manchester

BWB's involvement in this 40 hectare urban regeneration project commenced when we were appointed by Buckingham Group to act as their Consulting Engineer for a Design & Build tender for the remediation...

Key contacts: Ashley Lowe

East Midlands Distribution Centre

East Midlands Distribution Centre is a 250 acre multi-modal industrial and logistics facility close to M1 Junction 24 and East Midlands Airport.

BWB was commissioned to undertake the ci...

Key contacts: Colin Langford David Mackrory

Trinity Walk, Wakefield

BWB was the civil and structural engineer for the prestigious redevelopment of the old Market Quarter of Wakefield town centre. The 500,000 sq. ft. scheme provided retail space over three floors confi...

Key contacts: Dominic Ginty

M&S Distribution Centre, Bradford

At the time of construction this flagship distribution warehouse, with a gross internal area of 1.1 million sq.ft, was one of the largest enclosed spaces in the UK. BWB Consulting was involved in the ...

Key contacts: Tim Loveridge Dominic Ginty

Cumbria Bank Stabilisation

Significant, prolonged rainfall and flooding of the Croasdale Beck near to the site in November 2009, contributed to the deterioration and eventual failure of the embankment supporting the public high...

Key contacts: Darren Harvey

Western Gateway Infrastructure Scheme

The Western Gateway Infrastructure Scheme (WGIS) is £30M worth of road improvements that are being delivered by a joint venture between Hochtief and the Buckingham Group. BWB has been commissioned to...

Key contacts: Steve Wooler Bouziane Boukhateb

COPCUT RISE, DROITWICH

BWB's earthworks and drainage expertise is being utilised by housebuilder William Davis Ltd for this major 740-home residential development in Droitwich. The 100-acre Copcut Rise scheme includes affor...

Key contacts: Andy Passmore

Spring Bank Landslip

BWB were instructed by Wade Group to act as Geotechnical Designers for a site at Spring Bank Close in Blackburn. The site comprised a recently failed slope which was bounded to the north by industrial...

Key contacts: David Radley

Contacts

Name: David Hollingsworth
Job Title: Group Director - Environment

E: Dave.Hollingsworth@bwbconsulting.com


Name: Chris Sakalas
Job Title: Service Manager

E: Chris.Sakalas@bwbconsulting.com