Settlement Analysis

The reliable prediction of pre and post construction ground deformations is critical to the success of development. BWB has in-house experts to predict the likely magnitude and mechanisms of settlement using the latest modelling software and design remedial measures to reduce settlement to acceptable levels. All the design work is undertaken using the latest geotechnical design software and is to current British Standards and Eurocode EC7.

Related Projects

Didcot A Power Station

BWB has played a key role in the acquisition and planning stages of a £100m warehouse development at the former Didcot A Power Station in Oxfordshire. The proposals from Clowes Developments and Graft...

Key contacts: Rachel Cheetham

Royal Docks Hotels

BWB provided various design and project management support in relation to the external works, drainage and utilities for this development of two new hotels at the Royal Docks in the London Borough of ...

Key contacts: Daniel Bailey

Gloucester Gateway Motorway Services Area

In 2012 BWB were appointed as the Civil and Structural Engineer for the new £40m dual-sided Gloucester Gateway Motorway Services Area (MSA) between Junctions 11a and 12 of the M5. BWB were brought on...

Key contacts: Simon Hilditch Darren Hodgson

ENABLING WORKS, G. PARK, CRICK

BWB Consulting was commissioned by Buckingham Group to deliver civil engineering and infrastructure design services to enable the construction of a Costco distribution warehouse at Crick in Northampto...

Key contacts: Bouziane Boukhateb

Caledonian Road, London

This mixed-use development provided 350 bed spaces and was located adjacent to the Caledonian Road tube station. The site also provided 7,000 sq ft of retail space and 6,000 sq ft of office space and ...

Key contacts: Colin Langford

Sports City, Manchester

BWB's involvement in this 40 hectare urban regeneration project commenced when we were appointed by Buckingham Group to act as their Consulting Engineer for a Design & Build tender for the remediation...

Key contacts: Ashley Lowe

Travelodge, Hull

BWB Consulting was central in the design and development of this 80 bedroom Travelodge hotel for Wykeland on Pryme Street in the centre of Hull.

As BWB was experienced in the delivery ...

Key contacts: Dominic Ginty

York Sports Village

York Sport Village was a £9 million sports facility on Heslington East Campus that featured a competition-standard, eight lane, 25-metre swimming pool, learner pool, full size 3G Astroturf pitch and ...

Key contacts: Dominic Ginty

East Midlands Distribution Centre

East Midlands Distribution Centre is a 250 acre multi-modal industrial and logistics facility close to M1 Junction 24 and East Midlands Airport.

BWB was commissioned to undertake the ci...

Key contacts: Colin Langford David Mackrory

Chettles Yard, Nottingham

Completed in three phases in 162 weeks, Chettles Yard student accommodation centre sprawls over 10 acres and provided 1,063 student accommodation units also houses five retail units, a Magnet Showroom...

Key contacts: Colin Langford

Trinity Walk, Wakefield

BWB was the civil and structural engineer for the prestigious redevelopment of the old Market Quarter of Wakefield town centre. The 500,000 sq. ft. scheme provided retail space over three floors confi...

Key contacts: Dominic Ginty

Larkhill Retirement Village

Larkhill is a 327-unit retirement village on a greenfield site on the southern outskirts of Clifton, Nottinghamshire. The £35m project was developed by the ExtraCare Charitable Trust and extends over...

Key contacts: Peter Davies

M&S Distribution Centre, Bradford

At the time of construction this flagship distribution warehouse, with a gross internal area of 1.1 million sq.ft, was one of the largest enclosed spaces in the UK. BWB Consulting was involved in the ...

Key contacts: Tim Loveridge Dominic Ginty

Highfields Science Park

BWB Consulting was appointed by Blueprint, a public/private sector JV regeneration company, to apply our full range of multi-disciplinary services to the challenging task of helping to secure planning...

Key contacts: Colin Langford

Wilton Logistical Platform

Katoen Natie's £15m logistical platform forms part of a wider £200m, LDPE plant built together with JV partners Huntsman International on the Wilton site.

The 30 shining silos, at 35...

Key contacts: Stefan Zalega

Birmingham Treatment Centre

This £35m development at Birmingham's City Hospital provided state-of-the-art facilities for one-stop diagnosis and treatment, including an ambulatory surgical unit, six theatres, extensive imaging f...

Key contacts: Mark Jones

Brough South

BWB are delivering a range of multi-disciplinary services for the £100 million Brough South mixed-use development in Yorkshire. The 175-acre site in the town of Brough includes the former airfield of...

Key contacts: Simon Stanley Ashley Lowe

COPCUT RISE, DROITWICH

BWB's earthworks and drainage expertise is being utilised by housebuilder William Davis Ltd for this major 740-home residential development in Droitwich. The 100-acre Copcut Rise scheme includes affor...

Key contacts: Andy Passmore

Dandara Arena Central, Birmingham

The £40m Dandara private rental sector apartment scheme is part of the Arena Central regeneration development in the heart of Birmingham city centre. The mixed-use scheme comprises two towers of 21 a...

Key contacts: Mark Jones

Contacts

Name: David Hollingsworth
Job Title: Group Director - Environment

E: Dave.Hollingsworth@bwbconsulting.com


Name: Chris Sakalas
Job Title: Service Manager

E: Chris.Sakalas@bwbconsulting.com