Building Physics

BWB's highly skilled Sustainable Building Services team use the fundamental principles of Building Physics to ensure the we deliver successful buildings which provide comfort for the occupant by the most energy efficient method.

Thorough site investigation and simulation can significantly reduce costs and risks to a build. Analysing and understanding the physics of environmental conditions in conjunction with the physical attributes of the proposed building produces highly accurate simulation data and the more certain the data ensures better Low or Zero Carbon Technologies (LZCT) options are selected.

Related Projects

Coombe Road, New Malden

A proposed development in New Malden has been granted planning approval. Plans include demolishing the buildings at numbers 5 to 29 Coombe Road and building one three-to-five storey and one six-to-se...

Key contacts: David Stairmand

Napier Gateway, Luton

Napier Gateway in Luton forms part of the overall 24.5 hectare, £300 million mixed-use regeneration scheme at Napier Park and Stirling Place which incorporates 685 residential apartments of up to 17 ...

Key contacts: David Stairmand

Somerleyton Road, Brixton

Somerleyton Road is an exciting community partnership that will see around 303 new homes, a theatre, a range of mixed uses including a new flexible community space, an educational space, cultural and ...

Key contacts: David Stairmand

Hammond Student Accommodation, Chichester

BWB's London based M&E team were selected to be part of the Bond Bryan Architects lead design team for this new build student residential development located in Chichester. The development will provid...

Key contacts:

Bridge House Care Home, Brighouse, West Yorkshire

Bridge House Care Homes is a new 66 bedroom care home development for Henson Healthcare (Bridge House) Ltd. It provides high quality residential, nursing and dementia care in a luxurious and homely en...

Key contacts: Jim Benson

Lakeside Academy, Telford

Lakeside Academy in Telford principally accommodates a new build primary school and secondary school, with post sixteen and community functions incorporated within the secondary school building all of...

Key contacts: David Stairmand

Joseph Leckie Academy Phase 1

The project involves the creation of a new three storey standalone ICT rich teaching block on the existing Joseph Leckie Academy campus.

The project was delivered using BIM technology...

Key contacts:

Ellen Wilkinson School, London

Ellen Wilkinson School for Girls is located in Acton, London. This £3M addition to an existing 1970's building consisted of a concrete frame forming 2 levels plus a plant room clad in brickwork.

Key contacts:

Horsham Gates

BWB are initially providing engineering consultancy services for the refurbishment of two existing office buildings in Horsham, with potential to extend the residential site in the future. The scheme...

Key contacts:

Telford Co-Operative Academy

Telford Co-Operative Academy principally accommodates a secondary school, with changing rooms for use by the adjacent tennis centre incorporated into the school building. A data centre is provided whi...

Key contacts: David Stairmand

Holy Trinity Academy (HTA), Telford

Holy Trinity Academy principally accommodates a secondary school, with community functions incorporated into the school building. BWB undertook concept through to detailed design of the mechanical and...

Key contacts: David Stairmand

Charlton Academy, Telford

Charlton Academy principally accommodates a new build secondary school, with a data centre servicing the local education network positioned within the academy. BWB undertook concept through to detail...

Key contacts: David Stairmand

Telford & Wrekin BSF

BWB's M&E team are currently delivering the Mechanical & Electrical design on behave of Shepherd Engineering Services for the final stages of the Telford & Wrekin BSF programme.

The sch...

Key contacts: David Stairmand

Southwater Leisure District

Southwater Leisure District in Telford incorporates prime town centre offices, new leisure space including cinema, hotel, restaurants and the council's extensions to the existing ice rink, Mecca Bingo...

Key contacts: David Stairmand

Centre AT7 Leisure Centre, Coventry

Centre AT7 was a new build swimming pool with associated changing rooms and refurbished fitness centre. The pool space included a health suite, children's splash pool and slides, in addition to a 25m ...

Key contacts: David Stairmand

West Bridgford Medical Centre

West Bridgford Medical Centre combined a number of GP surgeries into a single new build facility. The building included undercroft car parking, GP consulting rooms, treatment rooms and supporting offi...

Key contacts: David Stairmand

Ashperton Primary Academy, Ledbury

BWB Consulting is proud to have been the engineers appointed for all 4 phases of the Ashperton Primary Academy redevelopment in the beautifully landscaped rural setting in Herefordshire.

Key contacts:

New Arts Building King Edward VI College

King Edward VI College development houses a brand new student common room and larger refectory, a dedicated computer and graphics suite and a state-of-the-art studio for dance and drama on the part of...

Key contacts:

Stafford College Learning Resource Centre

Midlands-based CPMG Architects designed the new teaching facility to house the college's new Learning Resource Centre, beauty, hospitality and IT departments, alongside a main campus cafe, bistro and ...

Key contacts: David Stairmand

Bosideng, London

Chinese menswear specialist Bosideng branched out into the UK market with this state-of-the-art flagship development located in a prominent position in Mayfair, London. The striking building provides ...

Key contacts: Dominic Ginty

York Sports Village

York Sport Village was a £9 million sports facility on Heslington East Campus that featured a competition-standard, eight lane, 25-metre swimming pool, learner pool, full size 3G Astroturf pitch and ...

Key contacts: Dominic Ginty

E-On HQ, Nottingham

"Project Green" was the aspirational title adopted for this £30m scheme to provide energy giant E.ON UK with a new regional HQ for circa 1000 staff in Nottingham. BWB Consulting was appointed to prov...

Key contacts: Colin Langford

Velocity Commercial Office

The Velocity project comprised the construction of two five-storey office buildings that provide around 105,000 sq. ft. of net lettable area. The project was on the Brooklands estate in Weybridge, whi...

Key contacts: David Stairmand

Chettles Yard, Nottingham

Completed in three phases in 162 weeks, Chettles Yard student accommodation centre sprawls over 10 acres and provided 1,063 student accommodation units also houses five retail units, a Magnet Showroom...

Key contacts: Colin Langford

Passivhaus, Watermead Business Park

Interserve's office at Watermead Business Park was the first Carbon Negative PassivHaus Accredited office building in the UK. BWB was engaged as part of the design team formed by Interserve/Raynsway t...

Key contacts: Mark Jones

QUEEN ELIZABETH HOSPITAL, BIRMINGHAM

The £560m Queen Elizabeth Hospital also provides a University Teaching and Mental Health Facility in Birmingham, to enhance the full range of acute clinical care and to develop an integrated locality...

Key contacts: David Stairmand

Project Hadar

Project Hadar is the £20m refurbishment of an existing laboratory research building in the centre of Cambridge to suit a new biomedical research tenant at the University of Cambridge. The building ha...

Key contacts: David Stairmand

Contacts

Name: Jim Benson
Job Title: Operations Director M&E

E: Jim.Benson@bwbconsulting.com


Name: Leon Maddison
Job Title: Director

E: leon.maddison@bwbconsulting.com