Building Information Modelling (BIM)

BWB has been at the forefront of BIM for several years and are engaged on numerous projects utilising BIM to varying levels.

We utilise REVIT modelling software as our modelling platform and interface this intelligently with our analysis and design software. All our technicians are REVIT capable and we will typically model in 3-D even if other members of the design team are not.

Related Projects

Napier Gateway, Luton

Napier Gateway in Luton forms part of the overall 24.5 hectare, £300 million mixed-use regeneration scheme at Napier Park and Stirling Place which incorporates 685 residential apartments of up to 17 ...

Key contacts: David Stairmand

HSBC Headquarters, Birmingham

BWB Consulting has delivered multi-disciplinary engineering and environmental services for HSBC's new headquarters in Birmingham city centre. The 210,000 sq ft building forms the first phase of the 9....

Key contacts: Mark Jones

Southgate Student Accommodation, Leicester

BWB are excited to be working on this large redevelopment of a former bus station site in the historic heart of Leicester, opposite De Montfort University campus. The site compromises four buildings s...

Key contacts: Mark Jones Kris James

Widmerpool Powerplant, Nottingham

Located adjacent the A46 near Widmerpool, Nottingham the 6.55MWe Biomass-fired combined heat and power station is designed to provide sustainable green electricity for over 10,000 homes and supply up ...

Key contacts: Glenn Foulk Martin Strong

Grangetown Fire Station

A £5m facelift for Grangetown and Thornaby's ageing fire stations to replace them with state-of-the-art buildings to provide first class and flexible facilities to support local needs.

...

Key contacts: Mark Jones

Thornaby Fire Station

A £5m facelift for Grangetown and Thornaby's ageing fire stations to replace them with state-of-the-art buildings to provide first class and flexible facilities to support local needs.

...

Key contacts: Mark Jones

Coral Springs Care Village

The new build Coral Springs Care Village development in Witney, Oxfordshire for Richmond Villages provides the following accommodation:-
- Village Care Centre from Basement to Second Floor inco...

Key contacts: David Stairmand

Lakeside Academy, Telford

Lakeside Academy in Telford principally accommodates a new build primary school and secondary school, with post sixteen and community functions incorporated within the secondary school building all of...

Key contacts: David Stairmand

Joseph Leckie Academy Phase 1

The project involves the creation of a new three storey standalone ICT rich teaching block on the existing Joseph Leckie Academy campus.

The project was delivered using BIM technology...

Key contacts:

Biomedical Phases 1 & 2, University of York

BWB Consulting were instructed by The University of York through Faithful & Gould to undertake civil & structural design services for a proposed new Biomedical & Natural Sciences Building off Wentwort...

Key contacts: Dominic Ginty

LYMM FIRE STATION & SAFETY CENTRE

BWB Consulting has delivered multi-disciplinary engineering services for the Fire Station & Safety Centre at the village of Lymm in Cheshire. The building is designed to deliver the active response as...

Key contacts:

Harington School, Oakham

Harington School is a £4.2m new build sixth form centre including general teaching classrooms, specialist information technology classroom, science laboratories, music practice and performance facili...

Key contacts: Glenn Foulk

Resorts World, Birmingham

BWB Consulting is proud to have been the Civil and Structural Engineers for Resorts World at Birmingham's NEC. The £150m development includes a casino, four star hotel and five-star suites, spa inclu...

Key contacts: Mark Jones Andy Passmore

Telford Co-Operative Academy

Telford Co-Operative Academy principally accommodates a secondary school, with changing rooms for use by the adjacent tennis centre incorporated into the school building. A data centre is provided whi...

Key contacts: David Stairmand

New IVF Clinic, Sandiacre

Octavia House, Sandiacre is an existing office building previously occupied by the NHS. The building is to be renovated to provide fertility services run by Nurture LLP. The accommodation includes of...

Key contacts:

Holy Trinity Academy (HTA), Telford

Holy Trinity Academy principally accommodates a secondary school, with community functions incorporated into the school building. BWB undertook concept through to detailed design of the mechanical and...

Key contacts: David Stairmand

Charlton Academy, Telford

Charlton Academy principally accommodates a new build secondary school, with a data centre servicing the local education network positioned within the academy. BWB undertook concept through to detail...

Key contacts: David Stairmand

Ernesford Grange Community Academy

Ernesford Grange Community Academy in Coventry is due to be handed over this week, 6 weeks ahead of schedule.

The new academy is one of 5 schools being delivered as part of the 'Midlan...

Key contacts: Dominic Ginty

Multi-storey Car Park, Durham Road

Following an extensive tendering period and after completion of a detailed value engineering process, BWB Consulting worked with appointed contractor Simons Construction for delivery of the new £8M m...

Key contacts: Dominic Ginty

CDS Solihull Aero Engine Controls

CDS Solihull is an advanced manufacturing facility which is part of the Rolls Royce Group.

BWB are proud to be working on the Aero Engine Controls, part of the Rolls-Royce Group Advanc...

Key contacts: Mark Jones Glenn Foulk

Logistics North Infrastructure - Phases 1 & 2

Logistics North is one of the largest distribution developments in the north of England and BWB are proud to have been involved since the concept stage. The 250-acre business park near Bolton is desig...

Key contacts: Warren Bennett

London Gateway Logistics Centre

BWB have provided multi-disciplinary services on the first facility to be completed at one of Europe's largest logistics developments. The 300-hectare logistics park at DP World London Gateway will pr...

Key contacts: Bouziane Boukhateb Peter Davies

INTU Potteries Centre Stoke on Trent

BWB have been appointed to develop the new Intu Potteries shopping centre redevelopment in Stoke. The 58,000 sq. ft. scheme comprises a new 9 screen multiplex cinema and the refurbishment of the exist...

Key contacts: Mark Jones

Priority Schools Build Programme

The Priority School Building programme was launched in 2011 and has been centrally procured by the EFA on behalf of the Department for Education. 261 schools have been rebuilt and or renovated under ...

Key contacts: Mark Jones Dominic Ginty

Laleham Gap School

Laleham Gap School is a specialist SEN provision for high functioning pupils aged 3-16 with Autistic Spectrum Disorder and/or Speech and Language disorders. The school has been relocated through the P...

Key contacts: Dominic Ginty

Telford & Wrekin BSF

BWB's M&E team are currently delivering the Mechanical & Electrical design on behave of Shepherd Engineering Services for the final stages of the Telford & Wrekin BSF programme.

The sch...

Key contacts: David Stairmand

Pavilions East, Peterborough

Hampton HQ Building was an innovative three storey, 40,000sq ft. office block at Peterborough's newest and the most popular business district. BWB was appointed by property developers Sladen Estates a...

Key contacts: Dominic Ginty

Centre AT7 Leisure Centre, Coventry

Centre AT7 was a new build swimming pool with associated changing rooms and refurbished fitness centre. The pool space included a health suite, children's splash pool and slides, in addition to a 25m ...

Key contacts: David Stairmand

Acre Mills Huddersfield New Out Patient facility

The development involved the conversion and extension of a Grade II Listed former wire factory in Lindley to facilitate the increasing requirement for healthcare premises. The refurbished and modernis...

Key contacts: Dominic Ginty Karen Sinclair

Cystic Fibrosis Unit, City Hospital

The new £6.6M Cystic Fibrosis unit at the City Hospital Nottingham aims to provide 'home in hospital' for around 250 adult Cystic Fibrosis patients from Nottinghamshire and surrounding.

...

Key contacts:

Caledonian Road, London

This mixed-use development provided 350 bed spaces and was located adjacent to the Caledonian Road tube station. The site also provided 7,000 sq ft of retail space and 6,000 sq ft of office space and ...

Key contacts: Colin Langford

Bosideng, London

Chinese menswear specialist Bosideng branched out into the UK market with this state-of-the-art flagship development located in a prominent position in Mayfair, London. The striking building provides ...

Key contacts: Dominic Ginty

York Sports Village

York Sport Village was a £9 million sports facility on Heslington East Campus that featured a competition-standard, eight lane, 25-metre swimming pool, learner pool, full size 3G Astroturf pitch and ...

Key contacts: Dominic Ginty

Darlington Campus, University of Teesside

BWB Consulting were a major part of the winning bid team for the delivery of the striking Darlington Campus Building for Teesside University. A major feature of the building is the creation of a 'shi...

Key contacts: Mark Jones

E-On HQ, Nottingham

"Project Green" was the aspirational title adopted for this £30m scheme to provide energy giant E.ON UK with a new regional HQ for circa 1000 staff in Nottingham. BWB Consulting was appointed to prov...

Key contacts: Colin Langford

Severn Trent Water HQ, Coventry

BWB Consulting was appointed by Stoford Developments Ltd to provide civil, structural, geo-environmental, flood and traffic services on Severn Trent's £35m Headquarters Building in Coventry City cent...

Key contacts: Mark Jones Andy Passmore

QUEEN ELIZABETH HOSPITAL, BIRMINGHAM

The £560m Queen Elizabeth Hospital also provides a University Teaching and Mental Health Facility in Birmingham, to enhance the full range of acute clinical care and to develop an integrated locality...

Key contacts: David Stairmand

Arena Central, Birmingham

BWB Consulting is providing multi-disciplinary engineering services to Arena Central Developments Ltd for this exciting project in the heart of Birmingham's city centre. The 9.2 acre site was home to ...

Key contacts: Mark Jones

Harperbury Free School

Harperbury Free School is a new state secondary school primarily for families living in Shenley, Radlett, London Colney, Bricket Wood, Park Street, Borehamwood and Elstree. The school is a four form e...

Key contacts:

Tamworth Assembly Rooms Refurbishment

BWB are pleased to be involved in this exciting transformation project of the 127 year's old Tamworth landmark Assembly Rooms. The theatre will be restored and extended in a major refurbishment progra...

Key contacts: David Stairmand

A49 Goose Green Bypass, Wigan

BWB is leading the design team for the £15 million A49 Goose Green link road project at Wigan in Greater Manchester. The scheme consists of 2.3 km of dual carriageway including an upgrade from single...

Key contacts: Andrew Wood

Dandara Arena Central, Birmingham

The £40m Dandara private rental sector apartment scheme is part of the Arena Central regeneration development in the heart of Birmingham city centre. The mixed-use scheme comprises two towers of 21 a...

Key contacts: Mark Jones