Sustainable Buildings Design

Utilising an holistic approach and early consideration of Building Services Design into the initial stages of the design process will help the building to reach its full potential in the Sustainability stakes. More recently the emergence of "Passivhaus" method of construction takes Sustainable Building Design to the next level.

Sustainable design is the thread which runs through each of our projects from start to finish; always being part of our design ethos means the majority of our project work achieves higher BREEAM/EPC ratings than expected.

Related Projects

Napier Gateway, Luton

Napier Gateway in Luton forms part of the overall 24.5 hectare, £300 million mixed-use regeneration scheme at Napier Park and Stirling Place which incorporates 685 residential apartments of up to 17 ...

Key contacts: David Hurren David Stairmand

Somerleyton Road, Brixton

Somerleyton Road is an exciting community partnership that will see around 303 new homes, a theatre, a range of mixed uses including a new flexible community space, an educational space, cultural and ...

Key contacts: David Hurren Helen Payne

Hammond Student Accommodation, Chichester

BWB's London based M&E team were selected to be part of the Bond Bryan Architects lead design team for this new build student residential development located in Chichester. The development will provid...

Key contacts: Helen Payne

Southgate Student Accommodation, Leicester

BWB are excited to be working on this large redevelopment of a former bus station site in the historic heart of Leicester, opposite De Montfort University campus. The site compromises four buildings s...

Key contacts: Mark Jones Kris James

Lakeside Academy, Telford

Lakeside Academy in Telford principally accommodates a new build primary school and secondary school, with post sixteen and community functions incorporated within the secondary school building all of...

Key contacts: Helen Payne David Stairmand

Joseph Leckie Academy Phase 1

The project involves the creation of a new three storey standalone ICT rich teaching block on the existing Joseph Leckie Academy campus.

The project was delivered using BIM technology...

Key contacts: Helen Payne

Lewisham Gateway, London

Lewisham Gateway is a PPP venture between Muse Developments, TfL and LB Lewisham. The scheme requires major infrastructure changes to the existing roundabout to create a new improved transport circula...

Key contacts: David Hurren Richard Lowenthal Iqbal Rassool

Outpatients Department Refurb, Charing Cross Hospital

BWB is refurbishing the M&E services of two outpatients departments within the Imperial College NHS Trust. The Main Outpatients department and the ENT, Ophthalmology and Audiology departments of Char...

Key contacts: Helen Payne

Resorts World, Birmingham

BWB Consulting is proud to have been the Civil and Structural Engineers for Resorts World at Birmingham's NEC. The £150m development includes a casino, four star hotel and five-star suites, spa inclu...

Key contacts: Mark Jones Andy Passmore

Horsham Gates

BWB are initially providing engineering consultancy services for the refurbishment of two existing office buildings in Horsham, with potential to extend the residential site in the future. The scheme...

Key contacts: Helen Payne

Telford Co-Operative Academy

Telford Co-Operative Academy principally accommodates a secondary school, with changing rooms for use by the adjacent tennis centre incorporated into the school building. A data centre is provided whi...

Key contacts: Helen Payne David Stairmand

Holy Trinity Academy (HTA), Telford

Holy Trinity Academy principally accommodates a secondary school, with community functions incorporated into the school building. BWB undertook concept through to detailed design of the mechanical and...

Key contacts: Helen Payne David Stairmand

Charlton Academy, Telford

Charlton Academy principally accommodates a new build secondary school, with a data centre servicing the local education network positioned within the academy. BWB undertook concept through to detail...

Key contacts: Helen Payne David Stairmand

Summer Field School Pavilion, Oxford

BWB are excited to work on one of the country's top prep schools to build a state-of-the-art multi use Sports Pavilion which has further enhanced Summer Field's excellent facilities.

T...

Key contacts: Helen Payne

Telford & Wrekin BSF

BWB's M&E team are currently delivering the Mechanical & Electrical design on behave of Shepherd Engineering Services for the final stages of the Telford & Wrekin BSF programme.

The sch...

Key contacts: David Stairmand Helen Payne

Southwater Leisure District

Southwater Leisure District incorporates prime town centre offices, new leisure space including cinema, hotel, restaurants and the Council's extensions to the existing Ice Rink, Mecca Bingo and Ten Pi...

Key contacts: Helen Payne David Stairmand

Centre AT7, Green Road, Coventry

Centre AT7 is a new build swimming pool with associated changing rooms and refurbished fitness centre. The pool space includes a health suite, children's splash pool and slides, in addition to a 25m p...

Key contacts: Helen Payne

Ashperton Primary Academy Ledbury

BWB are proud to have been the engineers appointed for all 4 Phases of the Ashperton Primary Academy redevelopment in the beautifully landscaped rural setting in Herefordshire.

Phase 1...

Key contacts: Helen Payne

Generator London Hostel Refurb

BWB was excited to take on the challenge of upgrading this 800 B&B backpackers and party hostel in central London housed within a Grade 2 Listed Building.

The hostel underwent signific...

Key contacts: Helen Payne David Stairmand

New Arts Building King Edward VI College

King Edward VI College development houses a brand new student common room and larger refectory, a dedicated computer and graphics suite and a state-of-the-art studio for dance and drama on the part of...

Key contacts: Helen Payne

Cystic Fibrosis Unit, City Hospital

The new £6.6M Cystic Fibrosis unit at the City Hospital Nottingham aims to provide 'home in hospital' for around 250 adult Cystic Fibrosis patients from Nottinghamshire and surrounding.

...

Key contacts:

Millharbour, Isle of Dogs

This is a £250m residential-led, mixed-use development within a stone's throw of Canary Wharf that will provide up to 1,100 residential units and 1500sq.m of mixed retail and cafe/restaurant developm...

Key contacts: Steve Wooler Helen Payne

Stafford College LRC

Midlands based CPMG Architects designed the new teaching facility to house the college's new Learning Resource Centre, beauty, hospitality and IT departments, alongside a main campus cafe, bistro and ...

Key contacts: David Stairmand

Ormiston Sir Stanley Matthews Academy

Ormiston Sir Stanley Matthews Academy, part of the Stoke BSF initiative, is a new build academy built to replace the old Blurton High School and Enterprise College faculties.

The new ...

Key contacts: David Stairmand

Bosideng, London

Bosideng, the Chinese menswear specialist branched out into the UK market with this state-of-the-art flagship development located in prominent position on Street.

The striking building ...

Key contacts: Dominic Ginty

York Sports Village

York Sport Village was a £9 million sports facility on Heslington East Campus that featured a competition-standard, eight lane, 25-metre swimming pool, learner pool, full size 3G Astroturf pitch and ...

Key contacts: Dominic Ginty

Darlington Campus, University of Teesside

BWB Consulting were a major part of the winning bid team for the delivery of the striking Darlington Campus Building for Teesside University. A major feature of the building is the creation of a 'shi...

Key contacts: Mark Jones

EMDC (East Midlands Distribution Centre)

East Midlands Distribution Centre is a 250 acre multi-modal industrial and logistics facility close to M1 Junction 24and East Midlands Airport.

BWB were commissioned to undertake the ci...

Key contacts: Colin Langford David Mackrory

E-On HQ, Nottingham

"Project Green" was the aspirational title adopted for this £30m scheme to provide energy giant E.ON UK with a new regional HQ for circa 1000 staff in Nottingham.

BWB were appointed t...

Key contacts: Colin Langford

MOOG Aircraft Production Facility

BWB's SBS Team were contracted by EIC Ltd, to provide mechanical design for a new 17,000m2 production facilities and office development on the new technology park, i54 in Wolverhampton. The project i...

Key contacts: David Stairmand

Passivhaus, Watermead Business Park

Interserve's office at Watermead Business Park was the first Carbon Negative PassivHaus Accredited office building in the UK. BWB were engaged as part of the design team formed by Interserve/Raynsway ...

Key contacts: Mark Jones

Farnley Park Academy, Leeds

The £23M improvement scheme to Farnley Park Maths & Computing College contract was constructed as part of the Leeds Building Schools for the Future (BSF) programme. The project involved the construc...

Key contacts: Dominic Ginty

Severn Trent Water HQ, Coventry

BWB were appointed by Stoford Developments Ltd to provide civil, structural, geo-environmental, flood and traffic services on Severn Trent's £35m Headquarters Building in Coventry City centre.
...

Key contacts: Mark Jones Andy Passmore

School of Sports Science, University of Teesside

BWB Consulting were a major part of the winning bid team put together to deliver the School Of Health and Sport Science Extension for Teesside University at their city centre campus in Middlesbrough. ...

Key contacts: Mark Jones Colin Langford

Trinity Walk, Wakefield

BWB were the civil and structural engineer for the prestigious redevelopment of the old Market Quarter of Wakefield Town Centre. The 500,000 sq. ft. scheme provides retail space over three floors conf...

Key contacts: Dominic Ginty

Faculty of Business & Law, DeMontfort University

This 100,000 sq.ft. new-build faculty brought together two University Schools, eight departments, 250 staff and 5,000 students into one landmark building at one of the most prominent positions in Leic...

Key contacts: Mark Jones

Olympic House, Glasgow

BWB were appointed as structural engineers for the refurbishment and conversion of this grade B listed building in the centre of Glasgow. The project comprised the conversion of a former office block ...

Key contacts: Dominic Ginty

Experian Landmark House, Nottingham

This striking project was phase 1 of a three phase office development designed to centralise Experian's Nottingham operations and provide expansion space.

BWB worked as part of the d...

Key contacts: Colin Langford

Eco House, University of Nottingham

At BWB we strive to be at the forefront of sustainable construction and low carbon techniques and innovation. Looking back to this 2004 project today, it is interesting to see that many 'experimental'...

Key contacts: David Stairmand

Conkers Discovery Centre

The discovery/visitor centre development is located within a reclaimed mining area which is surrounded by a mature woodland environment. The primary objective of the project was to create a fun learni...

Key contacts: Mark Jones

Contacts

Name: Mark Jones
Job Title: Service Director - Building Structures

E: Mark.Jones@bwbconsulting.com


Name: David Stairmand
Job Title: Service Director - Sustainable Building Services

E: David.Stairmand@bwbconsulting.com