Contract Administration

The right procurement solution is vital in ensuring that value added during the planning and design process doesn't fade through tender and construction. The professionals in our Infrastructure Management team have the right engineering background to see that the right processes are followed, using the appropriate forms of contract. Ready access to our design teams means that obstacles encountered during construction can be quickly overcome.

Our contract administration services would include the preparation of civil engineering cost estimates based on recent tender rates; full tender administration and evaluation. The Team would also get heavily involved in awarding contracts on behalf of the client and administration of those contracts including chairing pre-start meetings and any interim evaluations.

BWB also offers a comprehensive range of site inspection services through the Contract Administration department.

Related Projects

Blackpool Tower

Blackpool Tower is an iconic grade 1 listed landmark and a great feat of Victorian engineering. Built in 1894 and standing at 518 feet, the steel structure is not the only part of the tower complex as...

Key contacts: Colin Langford

Battery Park, Selly Oak

BWB provided multi-disciplinary services to a site in Selly Oak that was formerly used as iron foundry, gas works and commercial and domestic tips. Following the regeneration of the site, it will be h...

Key contacts: Tim Hull

QMP: Main Library Refurbishment Phase 1 and 2

QMP acted as the Quantity Surveyor on the refurbishment to the existing library for University of Westminster. The scheme involved the remodelling of the existing space and opening up of the old parti...

Key contacts: Anthony Hart

Rossington Colliery Redevelopment

The former Rossington Colliery site near Junction 3 of the M18 south of Doncaster is to be regenerated into a mixed-use development comprising approximately 1200 homes when complete. In October 2013...

Key contacts: Simon Stanley Chris Sakalas

Prince of Wales Colliery Re-Development

The former Prince of Wales colliery site near Junction 32 of the M62 on the northern outskirts of Pontefract is to be regenerated into a mixed-use development comprising approximately 900 homes and 21...

Key contacts: Simon Stanley Ashley Lowe

Sports City, Manchester

BWB's involvement in this 40 hectare urban regeneration project commenced when we were appointed by Buckingham Group to act as their Consulting Engineer for a Design & Build tender for the remediation...

Key contacts: Bouziane Boukhateb Robert Henshall

Witham St Hughes (Former RAF Swinderby)

BWB were appointed in Autumn 2005 by Strawsons Property to provide comprehensive environmental and civil engineering services for the redevelopment of the former RAF Swinderby into a new village settl...

Key contacts: Daniel Bailey

QMP: Learning Centre Refurbishment

QMP provided client side project management & quantity surveying services for the scheme, which involved remodeling the lower ground and ground floor of the existing building, complicated by the requi...

Key contacts: Anthony Hart

QMP: Wigston Police Station Remodelling

BWB provided multi-disciplinary consultancy services for the refurbishment of Wigston police station for Leicestershire Police. These works included the demolition of the existing 2 storey tower, full...

Key contacts: Martin Strong

QMP: Student Union Refurbishment SOAS

QMP provided Building Design and Project Management services for the stunning interior refurbishment of the Students’ Union building at University of London’s School of Oriental and African Studie...

Key contacts: Martin Strong

Chettles Yard, Nottingham

Completed in three phases in 162 weeks, Chettles Yard student accommodation centre sprawls over 10 acres and provided 1,063 student accommodation units also houses five retail units, a Magnet Showroom...

Key contacts: Colin Langford

Queens Pier, Isle of Man

The pier was originally opened on 22nd July 1886 on behalf of the Isle of Man Harbour Board. Built at a cost of £45,000, Ramsey Queens Pier was designed purely as a landing point for steamers plying ...

Key contacts: Colin Langford

Beaconsfield Motorway Service Area

Positioned in the middle of Burtley Wood, just off Junction 2 on the M40, this picturesque setting is the ideal location for a Motorway Service Area (MSA). As lead designers for the off-site works, BW...

Key contacts: Darren Hodgson Kris James

Newmarket Lane Infrastructure

The masterplan for the former Newmarket Colliery site in Wakefield proposes a major mixed-use development of distribution and commercial office space, residential dwellings and a new 12,000 seat stadi...

Key contacts:

Contacts

Name: Matt Allcard
Job Title: Commercial Director

E: matt.allcard@bwbconsulting.com


Name: Martin Strong
Job Title: Service Director QMP

E: Martin.Strong@QMP.co.uk


Name: Anthony Hart
Job Title: Commercial Director QMP

E: Anthony.Hart@QMP.co.uk