Civil Engineering

BWB's extensive portfolio of civil engineering projects ranges from simple drainage and access facilities for one-off developments to complex ground modelling and strategic infrastructure that supports communities.

While whole-life costs may support greater initial investment, cash flow often dictates an alternative approach. We have a reputation for applying a commercial focus to all of our work without neglecting the vital sustainability issues.

Where there is regulatory approval involved, we are experts in successfully managing the technical approval process associated with the various section agreements but without compromising on innovation.

Related Projects

Arena Central, Birmingham

BWB are delighted to be providing multi-disciplinary engineering services to Arena Central Developments Ltd for this exciting project in the heart of Birmingham's city centre.

The 9.2 ...

Key contacts: Mark Jones

Unity and Armouries, Birmingham

Unity and Armouries is a new residential scheme split between Lower Essex Street and Bromsgrove Street, close to the Bullring shopping centre and the new Grand Central development at New Street Statio...

Key contacts: Mark Jones David Stairmand

Wakefield Eastern Relief Road

BWB Consulting provided multi-disciplinary services for the £33 million Wakefield Eastern Relief Road scheme. The by-pass was designed to ease congestion in Wakefield city centre by providing a direc...

Key contacts: Simon Stanley Daniel Bailey

Southgate Student Accommodation, Leicester

BWB are excited to be working on this large redevelopment of a former bus station site in the historic heart of Leicester, opposite De Montfort University campus. The site compromises four buildings s...

Key contacts: Mark Jones Kris James

Student Accommodation, Portswood Road

BWB are proud to be involved in this purpose-built state-of-the art student accommodation in Southampton.

The development will create a metropolitan and homely environment for the stude...

Key contacts: Colin Langford

New Walk Centre Offices, Leicester

BWB Consulting have been appointed to provide structural, civil and geotechnical design services on this mixed used city centre development, comprising of residential accommodation, office space, reta...

Key contacts: Colin Langford

Canary Wharf College, London

Canary Wharf College is a new build school in the Isle of Dogs that comprises of education and community accommodation for the locality offering up to 280 primary school places.

BWB h...

Key contacts: Nicola Moriarty

RAD Building, The University of Nottingham

BWB Consulting are proud to be appointed to work on the new build for the University of Nottingham, located at Nottingham's Jubilee Campus, which has a project value of £7 million.

Th...

Key contacts: Peter Davies

Victoria House, Milton Keynes

BWB are proud to be appointed to work on the new grade A office development located in Milton Keynes. The development consists of an office block over 5 storeys with undercroft parking. The offices ar...

Key contacts: Peter Davies

Cotswold BMW MINI

Cotswold BMW comissioned the construction of a prestigeous new dealership and service cetnre to bring together two existing facilities onto one site. The building is split into three distint areas fo...

Key contacts: Colin Langford

Royal Docks Hotels

BWB provided various design and project management support in relation to the external works, drainage and utilities for this development of two new hotels at the Royal Docks in the London Borough of ...

Key contacts: Daniel Bailey

East Side Locks Student Accommodation

BWB are proud to be providing multi-disciplinary engineering services for Alumno Developments 659 bed Student Accommodation for Birmingham City University Centre Campus project at Number 1 City Locks....

Key contacts: Mark Jones

Western Gateway Infrastructure Scheme

The Western Gateway Infrastructure Scheme (WGIS) is £30M worth of road improvements that are being delivered by a joint venture between Hochtief and the Buckingham Group. BWB has been commissioned to...

Key contacts: Steve Wooler

Worcester Six

BWB is proud to have played a key role at the planning stages of Worcester Six, a 70-acre development of office and industrial space at Junction 6 of the M5.

The site was originally int...

Key contacts: Andy Passmore

Biomedical Phases 1 & 2, University of York

BWB Consulting were instructed by The University of York through Faithful & Gould to undertake civil & structural design services for a proposed new Biomedical & Natural Sciences Building off Wentwort...

Key contacts: Dominic Ginty

LYMM FIRE STATION & SAFETY CENTRE

BWB Consulting has delivered multi-disciplinary engineering services for the Fire Station & Safety Centre at the village of Lymm in Cheshire. The building is designed to deliver the active response as...

Key contacts: Robert Henshall

CLEVELAND FIRE AUTHORITY QUEENS MEADOW FACILITY

BWB Consulting have been appointed by ISG to design this 2,960 square metre, 2-storey training and administration centre with associated car parking, support buildings and landscaping in Hartlepool. B...

Key contacts: Robert Henshall

Harington School, Oakham

Harington School is a £4.2m new build sixth form centre including general teaching classrooms, specialist information technology classroom, science laboratories, music practice and performance facili...

Key contacts: Glenn Foulk

Ellen Wilkinson School, London

Ellen Wilkinson School for Girls is located in Acton, London. This £3M addition to an existing 1970's building consisted of a concrete frame forming 2 levels plus a plant room clad in brickwork.

Key contacts: Nicola Moriarty

Eastpoint Retail Development, Nottingham

BWB were proud to be appointed to work on the £12 million gateway scheme at Eastpoint Retail Park in Nottingham. The project involved the construction of an Aldi Supermarket and other retail units in...

Key contacts: David Mackrory

Network 46

BWB were initially commissioned to undertake a range of pre-planning services across part of the site of the former RAF Swinderby, Witham St Hughs. The site included the majority of the hangars, asso...

Key contacts: Peter Davies Karen Sinclair

Portal Road

BWB were commissioned to assess the potential chemical and geotechnical constraints associated with development of the site at Portal Road, Melksham. BWB further assisted the Client with civil and str...

Key contacts: Karen Sinclair Peter Davies

83 Wimpole Street, London

IVI is a world leader in IVF Treatment, with over 53 clinics in 10 countries worldwide. Founded in 1990, IVI remains focused on delivering best-in-class patient care and invests significant resources ...

Key contacts: Helen Payne Anthony Hart

Resorts World, Birmingham

BWB Consulting is proud to have been the Civil and Structural Engineers for Resorts World at Birmingham's NEC. The £150m development includes a casino, four star hotel and five-star suites, spa inclu...

Key contacts: Mark Jones Andy Passmore

Gloucester Gateway Motorway Services Area

In 2012 BWB were appointed as the Civil and Structural Engineer for the new £40m dual-sided Gloucester Gateway Motorway Services Area (MSA) between Junctions 11a and 12 of the M5. BWB were brought on...

Key contacts: Simon Hilditch Darren Hodgson

New IVF Clinic, Sandiacre

Octavia House, Sandiacre is an existing office building previously occupied by the NHS. The building is to be renovated to provide fertility services run by Nurture LLP. The accommodation includes of...

Key contacts: Helen Payne

Multi-storey Car Park, Durham Road

Following an extensive tendering period and after completion of a detailed value engineering process, BWB Consulting worked with appointed contractor Simons Construction for delivery of the new £8M m...

Key contacts: Dominic Ginty

CDS Solihull Aero Engine Controls

CDS Solihull is an advanced manufacturing facility which is part of the Rolls Royce Group.

BWB are proud to be working on the Aero Engine Controls, part of the Rolls-Royce Group Advanc...

Key contacts: Mark Jones Glenn Foulk

St Ann's Valley, Nottingham

BWB Consulting have been appointed to deliver the construction of a mixture of apartments and retail units in St. Anns, Nottingham.

The new building provides 45 new homes with assisted...

Key contacts: Peter Davies

Logistics North Infrastructure - Phases 1 & 2

Logistics North is one of the largest distribution developments in the north of England and BWB are proud to have been involved since the concept stage. The 250-acre business park near Bolton is desig...

Key contacts: Warren Bennett

London Gateway Logistics Centre

BWB have provided multi-disciplinary services on the first facility to be completed at one of Europe's largest logistics developments. The 300-hectare logistics park at DP World London Gateway will pr...

Key contacts: Bouziane Boukhateb Peter Davies

INTU Potteries Centre Stoke on Trent

BWB have been appointed to develop the new Intu Potteries shopping centre redevelopment in Stoke. The 58,000 sq. ft. scheme comprises a new 9 screen multiplex cinema and the refurbishment of the exist...

Key contacts: Mark Jones

Kettering General Hospital - Maternity Theatres

The new £4.5m maternity unit at Kettering General Hospital was constructed as part of the P21+ framework. The development was designed to provide better support to the 3,800 births and 2,000 gynaecol...

Key contacts: Mark Jones

Priority Schools Build Programme

The Priority School Building programme was launched in 2011 and has been centrally procured by the EFA on behalf of the Department for Education. 261 schools have been rebuilt and or renovated under ...

Key contacts: Mark Jones Dominic Ginty

ENABLING WORKS, G. PARK, CRICK

BWB Consulting was commissioned by Buckingham Group to deliver civil engineering and infrastructure design services to enable the construction of a Costco distribution warehouse at Crick in Northampto...

Key contacts: Bouziane Boukhateb

Edith Borthwick School

The Edith Borthwick School is an SEN school which caters for youngsters with learning disabilities aged three to 19. The project, which forms part of the Education Funding Agency's Priority Schools Bu...

Key contacts:

Laleham Gap School

Laleham Gap School is a specialist SEN provision for high functioning pupils aged 3-16 with Autistic Spectrum Disorder and/or Speech and Language disorders. The school has been relocated through the P...

Key contacts: Dominic Ginty

Watermead Business Park, Leicester

Watermead Business Park is a multi-milion, premium quality office development on the north side of Leicester. It is ideally located, fronting the A607 at its junction with the A46, overlooking Waterme...

Key contacts: Peter Davies Tim Loveridge

Trent Basin, Nottingham

The Trent Basin scheme is a proposed new sustainable urban neighbourhood comprising an initial scheme for 41 homes that are to be developed in the next two years and a wider scheme for 119 homes repr...

Key contacts: Steve Wooler

Pavilions East, Peterborough

Hampton HQ Building is an innovative three storey, 40,000sq ft. office block at Peterborough's newest and the most popular business district. BWB were appointed by property developers Sladen Estates a...

Key contacts: Dominic Ginty

Acre Mills Huddersfield New Out Patient facility

The development involved the conversion and extension of a Grade II Listed former wire factory in Lindley to facilitate the increasing requirement for healthcare premises. The refurbished and modernis...

Key contacts: Dominic Ginty Karen Sinclair

College Gate, Oldbury

The College Gate development site is situated in Brandhall, a heavily urbanised area of Birmingham.

Following the original Outline Planning approval and purchase of the College Gate dev...

Key contacts: Iqbal Rassool Graham Littlewood

Waitrose Malmesbury

BWB Consulting provided a range of multi-disciplinary services for a new Waitrose store at the historic Wiltshire town of Malmesbury. The food retailer had purchased a 28,000 sq ft site on the outskir...

Key contacts: Stuart Nelmes

Asda, Chester

BWB Consulting were employed to provide design services for the construction of a new Asda Supermarket on an existing retail park.

An existing Bowling alley and Cinema were demolished ...

Key contacts: Robert Henshall

Cystic Fibrosis Unit, City Hospital

The new £6.6M Cystic Fibrosis unit at the City Hospital Nottingham aims to provide 'home in hospital' for around 250 adult Cystic Fibrosis patients from Nottinghamshire and surrounding.

...

Key contacts:

Northfield Village (Stone Road, Stafford)

BWB were proud to be appointed to work on the £20 million health care scheme located in Stafford. Northfield Village is a unique development that provides care & support facilities, accommodation and...

Key contacts: Peter Davies

The Barn, Sutton Bonington

BWB are proud to be appointed to work on the £9 million project located at the University of Nottingham, Sutton Bonington campus. The 3 storey development consists of a bar, dining room, function roo...

Key contacts: Peter Davies

Caledonian Road, London

A mixed use development providing 350 bed spaces, located adjacent to the Caledonian Road Tube Station with excellent transport links to Kings Cross Station. The site also provides 7,000 sq ft of reta...

Key contacts: Colin Langford

Southreef, Nottingham

BWB have had a long involvement in this stylish canal side apartment development. The original scheme went into administration in 2009, but work recommenced in 2013.

Canal Street is a m...

Key contacts: Colin Langford

Sports City, Manchester

BWB's involvement in this 40 hectare urban regeneration project commenced when we were appointed by Buckingham Group to act as their Consulting Engineer for a Design & Build tender for the remediation...

Key contacts: Bouziane Boukhateb Robert Henshall

Advanced Blades Casting Facility (ABCF)

BWB provided a truly integrated Engineering for this world class manufacturing facility for Rolls Royce located on the Advanced Manufacturing Park in Rotherham.

BWB worked collaborative...

Key contacts: Mark Jones Dominic Ginty

Stafford College LRC

Midlands based CPMG Architects designed the new teaching facility to house the college's new Learning Resource Centre, beauty, hospitality and IT departments, alongside a main campus cafe, bistro and ...

Key contacts: David Stairmand

Oxylane Sports Village, Nottingham

BWB were proud to play a key role in preparing documentation for this planning submission which proposed siting a major £20 million sporting venue on greenbelt land in Nottingham. The 50-acre Oxylane...

Key contacts: Tim Cooke Colin Langford

Ecclesbourne School, Derby

The project comprised the removal of the existing outdoor swimming pool and half of the all-weather tennis courts to construct a new multi-use sports hall with associated changing facilities for both ...

Key contacts: Glenn Foulk

Michaelwood Motorway Service Area

Michaelwood Motorway Service Area is circa 40 years old and the parking areas of both northbound and southbound sites have recently undergone an extensive refurbishment driven by the relocation of the...

Key contacts: Darren Hodgson Simon Hilditch

M25, Cobham

The M25 Cobham site, located to the south of the M25 between junctions 9 and 10, received planning permission for a Motorway Service Area (MSA) from the Secretary of State following a lengthy public i...

Key contacts: Darren Hodgson

Bullwell Joint Service Centre

BWB Consulting was part of the project team from the outset for this £22m state-of-the-art joint service centre in Nottingham which incorporated a significant healthcare facility. The 91,500 square f...

Key contacts: Peter Davies Mark Jones

York Sports Village

York Sport Village was a £9 million sports facility on Heslington East Campus that featured a competition-standard, eight lane, 25-metre swimming pool, learner pool, full size 3G Astroturf pitch and ...

Key contacts: Dominic Ginty

Darlington Campus, University of Teesside

BWB Consulting were a major part of the winning bid team for the delivery of the striking Darlington Campus Building for Teesside University. A major feature of the building is the creation of a 'shi...

Key contacts: Mark Jones

EMDC (East Midlands Distribution Centre)

East Midlands Distribution Centre is a 250 acre multi-modal industrial and logistics facility close to M1 Junction 24and East Midlands Airport.

BWB were commissioned to undertake the ci...

Key contacts: Colin Langford David Mackrory

E-On HQ, Nottingham

"Project Green" was the aspirational title adopted for this £30m scheme to provide energy giant E.ON UK with a new regional HQ for circa 1000 staff in Nottingham.

BWB were appointed t...

Key contacts: Colin Langford

West Dorset District Council Offices & Library, Dorchester

BWB have acted as Civil/Structural and Geo-Environmental Engineering consultants to Simons Group to deliver a high specification offices to West Dorset District Council.

Developed on ...

Key contacts: Colin Langford Mark Jones

St Anns Joint Services Centre

BWB Consulting were appointed from the concept and feasibility stage of this project to work with CPMG Architects, CPW Services Engineer, and Greater Nottingham LIFTCo, as Clients Representative, to d...

Key contacts: Peter Davies

Rushey Mead School, Leicester

BWB were appointed to work on this new 8,600 sq.m school campus including 6 court sports hall and enhanced teaching facilities as part of BSF programme, located in Leicester.

BWB under...

Key contacts: Colin Langford

Goodman Derby Commercial Park

BWB's full range of multi-disciplinary engineering services were utilised in the detailed design of the primary infrastructure required to facilitate the construction of over 2 million sq ft of indust...

Key contacts: Simon Hilditch

Farnley Park Academy, Leeds

The £23M improvement scheme to Farnley Park Maths & Computing College contract was constructed as part of the Leeds Building Schools for the Future (BSF) programme. The project involved the construc...

Key contacts: Dominic Ginty

Severn Trent Water HQ, Coventry

BWB were appointed by Stoford Developments Ltd to provide civil, structural, geo-environmental, flood and traffic services on Severn Trent's £35m Headquarters Building in Coventry City centre.
...

Key contacts: Mark Jones Andy Passmore

The Roundhouse, Derby College

This multimillion development saw the regeneration of a strategically important and historic site to become the home of the Derby College Centres of Vocational Excellence in technology, construction a...

Key contacts: Colin Langford Mark Jones

Raynesway, Derby

BWB's full range of multi-disciplinary engineering services were utilised in the detailed design of the primary infrastructure required to facilitate the construction of over 2,100,000 sq. ft. of indu...

Key contacts: Simon Hilditch Iqbal Rassool

TIPPING STREET, STAFFORD

BWB is proud to have played a key role in a major £38million regeneration scheme that has transformed part of Stafford town centre. The sustainable mixed-use development at Tipping Street was designe...

Key contacts: Darren Hodgson

Leicester Royal Infirmary Neonatal Centre

BWB Consulting formed part of the Interserve bid that was successful in being awarded this strategically important scheme to combine the neonatal units of the Leicester Royal Infirmary and the Leicest...

Key contacts: Mark Jones

School of Sports Science, University of Teesside

BWB Consulting were a major part of the winning bid team put together to deliver the School Of Health and Sport Science Extension for Teesside University at their city centre campus in Middlesbrough. ...

Key contacts: Mark Jones Colin Langford

Kingswood School, Corby

The Kingswood School in Corby caters for 1200 pupils and is built partly on the site of the existing Kingswood School and partly on the site of the former Our Lady and Pope John School.

...

Key contacts: Mark Jones

Trinity Walk, Wakefield

BWB were the civil and structural engineer for the prestigious redevelopment of the old Market Quarter of Wakefield Town Centre. The 500,000 sq. ft. scheme provides retail space over three floors conf...

Key contacts: Dominic Ginty

Erdington Retirement Village

Erdington Retirement Village is a £30 million 260 unit developement for the over 60's provided on a 2.6 hectare brownfield site. As well as residential units, the development includes community facil...

Key contacts: Peter Davies

Larkhill Retirement Village

Larkhill is a 327-unit retirement village on a greenfield site on the southern outskirts of Clifton, Nottinghamshire. The £35m project was developed by the ExtraCare Charitable Trust and extends over...

Key contacts: Peter Davies

Faculty of Business & Law, DeMontfort University

This 100,000 sq.ft. new-build faculty brought together two University Schools, eight departments, 250 staff and 5,000 students into one landmark building at one of the most prominent positions in Leic...

Key contacts: Mark Jones

M&S Distribution Centre, Bradford

At the time of construction this flagship distribution warehouse, with a gross internal area of 1.1 million sq.ft, was one of the largest enclosed spaces in the UK.

BWB were involved ...

Key contacts: Tim Loveridge Dominic Ginty

Bletchley Leisure Centre

BWB were key members of the project team who successfully delivered the award-winning Bletchley Leisure Centre which was completed in January 2010. The £18million development was central to Milton Ke...

Key contacts: Chris Holloway

Leeds Trinity, Student Accommodation

BWB were appointed by Morgan Sindall to provide civil and structural engineering services for 2 phases of student accommodation in Leeds. The new All Saints Court complex at Leeds Trinity University C...

Key contacts: Dominic Ginty

Beaconsfield Motorway Service Area

Positioned in the middle of Burtley Wood, just off Junction 2 on the M40, this picturesque setting is the ideal location for a Motorway Service Area (MSA). As lead designers for the off-site works, BW...

Key contacts: Darren Hodgson Kris James

Clumber St, Nottingham

BWB Consulting Ltd were appointed to undertake the Geo-environmental and Civil and Structural Roles for the redevelopment of an existing retail plot on Clumber Street in Nottingham.

The...

Key contacts: Nicola Moriarty

Highfields Science Park

BWB Consulting was appointed by Blueprint, a public/private sector JV regeneration company, to apply our full range of multi-disciplinary services to the challenging task of helping to secure planning...

Key contacts: Colin Langford

Goals Soccer, Bradford

The redevelopment of Hanson Academy schools sports and arts facility was enabled by partnership with a private leisure developer Goals Soccer Centres.

The £2.5m project was led by Aeda...

Key contacts: Dominic Ginty

Wilton Logistical Platform

Katoen Natie's £15M logistical platform forms part of a wider £200m, LDPE plant built together with JV partners Huntsman International on the Wilton site.

The 30 shining silos, at 35...

Key contacts: Stefan Zalega

Prologis Park, Coventry

Prologis Park Coventry is one of the country's most successful industrial parks. The scheme provides more than 2 million sq ft of mixed commercial/distribution development and is excellently located t...

Key contacts: Stefan Zalega Greg Nicholson

Litmus Building, Nottingham

The Litmus Building forms Phase 1 of the larger Litmus Project which will be the largest residential new-build project of its type to be built in Nottingham.

The Litmus complex is bein...

Key contacts: Mark Jones

Huntingdon Town Centre, Cambridgeshire

The Combined Justice Centre formed a part of the Huntingdon Town Centre re-development scheme that was successfully tendered by Clegg Developments through the OJEU process. BWB Consulting formed part ...

Key contacts: Colin Langford

Experian Landmark House, Nottingham

This striking project was phase 1 of a three phase office development designed to centralise Experian's Nottingham operations and provide expansion space.

BWB worked as part of the d...

Key contacts: Colin Langford

Nottingham NET light Transit

BWB Consulting provided expert traffic signals and modelling skills in reviewing and re-designing shared use traffic signal controlled junctions on the proposed tram route through Beeston town centre,...

Key contacts: David Mackrory Simon Hilditch

Conkers Discovery Centre

The discovery/visitor centre development is located within a reclaimed mining area which is surrounded by a mature woodland environment. The primary objective of the project was to create a fun learni...

Key contacts: Mark Jones

Adam's Building, Nottingham

Originally built for 600 workers involved in lace production, the Adams Building was considerably extended to cope with a rapid growth in demand for its quality products. It is now the home of Clarend...

Key contacts: Mark Jones

Didcot A Power Station Redevelopment

BWB has played a key role in the acquisition and planning stages of a £100m mixed-use development at the former Didcot A power station in Oxfordshire. The proposals from Clowes Developments and Graft...

Key contacts: David Hurren Chris Holloway David Hollingsworth

East Midlands Gateway

East Midlands Gateway delivers 6 million sq. ft. of rail and road served warehousing, creating up to 7000 jobs. The scope includes extensive highway works including major improvements to M1 junction 2...

Key contacts: David Mackrory

Ellistown, Coalville

The development is a proposed distribution park across a 40 hectare site to the west of Coalville.

The site had many constraints, including potential mining subsidence, visual impact co...

Key contacts: Darren Harvey Karen Sinclair David Radley

iPort, Doncaster

BWB Consulting is proud to be part of the team delivering the exciting £400 million iPort logistics development in Doncaster. The 700-acre scheme has outline planning consent for up to 6 million sq f...

Key contacts: Bouziane Boukhateb David Hollingsworth

Cecil Court

A major £4 million re-development of Cecil Court in Enfield will see the former office building converted into 42 one and two bedroom apartments.

BWB was appointed to deliver Civil and...

Key contacts: David Hurren Nicola Moriarty

White Rose Shopping Centre

BWB have been continuously working on the White Rose Shopping Centre for the past 8 years. We have been commissioned by Land Securities to supply multi-disciplinary design services on many projects ra...

Key contacts: Robert Henshall

Area B Car Park, Manchester Airport

BWB was delighted to be involved in the creation of a 9,000 space car park at Manchester Airport, the third busiest airport in the UK. The new long-stay facility was needed to replace the spaces lost ...

Key contacts: David Mackrory

Toyota Manufacturing Car Park

BWB Consulting were appointed by Weldon Plant to provide civil engineering design services for this Design and Build project to construct a major extension to the vehicle storage and logistics facilit...

Key contacts: Bouziane Boukhateb

Trafford Waters

Trafford Waters is a major mixed use development alongside the Trafford Centre and the Manchester Ship Canal. The development provides a highly sustainable and high quality built environment with ext...

Key contacts: Warren Bennett David Hollingsworth

Prince Of Wales Colliery - Parcel 2B

BWB Consulting has delivered a range of multi-disciplinary services for the first parcel of housing at the 77-acre Prince Of Wales mixed-use development in West Yorkshire. When complete, the former co...

Key contacts: Simon Stanley

Pebble Mill, Birmingham

The 11 hectare (27-acre) historic Pebble Mill site, part of the Calthorpe Estate in Edgbaston, was the BBC's Birmingham home for over 40 years until the doors were finally closed in 2004, when the cor...

Key contacts: David Mackrory

NHS Local Improvement Finance Trust (LIFT) schemes

BWB Consulting are involved in four NHS Local Improvement Finance Trust (LIFT) programmes working with Laing O'Rourke as part of the Primary Plus consortium.

The first tranche of these ...

Key contacts: Mark Jones

PRIDE PARK

Pride Park, a 50-acre commercial and industrial park, is one of the East Midland's premier locations for business and industry and has attracted considerable inward investment for Derby City. Original...

Key contacts: Mark Jones

NG2

The ng2 business park is a showcase of BWB Consulting's multi-disciplinary talents. The opportunity to regenerate the 42-acre strategic employment site which was created by the closure of Nottingham's...

Key contacts: Mark Jones

BROADWAY GREEN / FOXDENTON

The Broadway Green mixed-use scheme will see 121 acres of land in the Foxdenton area of Oldham developed into an exciting new business and residential development. Up to 1 million sq ft of business an...

Key contacts: Warren Bennett Simon Hilditch

Harperbury Free School

Harperbury Free School is a new state secondary school primarily for families living in Shenley, Radlett, London Colney, Bricket Wood, Park Street, Borehamwood and Elstree. The school is a four form e...

Key contacts: Nicola Moriarty

Markham Vale

BWB's multi-disciplinary expertise has been utilised throughout the development of this 200-acre business and distribution park on the former Markham Vale colliery site in Derbyshire. This major regen...

Key contacts: Greg Nicholson

Eastside

BWB Consulting provided multi-disciplinary engineering services for this prestigious £900M development scheme to transform a 17 hectare (42 acre) site at the heart of Nottingham's Eastside Regenerati...

Key contacts: Steve Wooler

Infinity Park, Derby

Since the turn of the Millennium, BWB has applied proven multi-disciplinary consultancy expertise in shaping the ambitious proposals for Infinity Park. The 100-acre development project was formerly kn...

Key contacts: Chris Holloway Iqbal Rassool

ISLINGTON WHARF - PHASE 3

BWB Consulting has been brought into this development to assist Muse in bringing the project over the line after the original project Engineers went bust. The scheme consists of 3 blocks of residentia...

Key contacts: Robert Henshall

DUNSTON GRANGE, CHESTERFIELD

BWB was commissioned by William Davis Ltd to deliver multidisciplinary pre-planning and infrastructure design services for this residential scheme of approximately 300 homes in Chesterfield, Derbyshir...

Key contacts: Paul Wilson Darren Hodgson

Plot K Kingsway Business Park, Rochdale

The development comprises the regeneration of a Brownfield site with the construction including four industrial units built speculatively by an investor. The business park is one of the largest devel...

Key contacts: Ashley Lowe

Contacts

Name: Andy Passmore
Job Title: Group Director - Transport and Infrastructure Group

E: Andy.Passmore@bwbconsulting.com


Name: David Mackrory
Job Title: Project Director

E: Dave.Mackrory@bwbconsulting.com