E-On HQ, Nottingham

Awards Won: ACE Engineering Excellence Award 2013: Building Structures Medium Size Consultant Category

E-On HQ, Nottingham

Key Facts

Year Completed

2012

Architect

Maber

Value

£30m

Floorplate Size

105000 sq. ft

Client

Miller Birch Developments

Build Type

New Build

Breeam Rating

Excellent

"Project Green" was the aspirational title adopted for this £30m scheme to provide energy giant E.ON UK with a new regional HQ for circa 1000 staff in Nottingham.

BWB were appointed to provide desk study and engineering feasibility advice on the proposal to demolish the existing building, located on a relatively small and heavily constrained site and to construct a 105,000 sq.ft. highly energy efficient nine storey tower with two levels of basement parking.

BWB extensively used REVIT Building Information Modelling (BIM) to develop the detailed design.

Key Challenges

BWB's initial advisory role in this flagship project included providing project feasibility and abnormal development cost advice together with planning support documentation. These ranged from geo-environmental investigations and recommendations, through to agreeing a sustainable transport and access strategy, including the incorporation of additional car parking within a heavily constrained site demise.

Significant technical issues and challenges were subsequently resolved at design stage, including complex party wall constraints, retention of a District Heating Main within the redeveloped site, and design of the basement sub-structure to a layout that avoids impacting on a listed cave system beneath the site.

Detailed structural design was undertaken using REVIT Building Information Modelling (BIM) software that enabled the Client's professional team to design a BREEAM Excellent and EPC A-rated building that has become Nottingham's greenest office development project.

Client Reference

The commitment of all the partners in creating Trinity House helped us to de-risk what was a very challenging initiative. I can honestly say there has not been one occasion where we felt the team would under-deliver and there have been many times where they've over-achieved and exceeded our expectations. I'd take this team anywhere in the world to work with E.ON. You can't ask for more.""